Table 1 Some of the bridge projects around the world and the accelerated construction methods Employed in them

From: Review of accelerated construction of bridge piers - methods and performance

Project

Year Completed

Location

Accelerated Construction Methods Employed

US 12 bridge over Interstate I-5

2011

Washington, US

Column-to-spread footing socket connection

Chang-Shou Bridge

1987

Nan-Tou, Taiwan

Precast segmental columns

New Samuel De Champlain Bridge

2019

Montréal, Canada

Precast segmental columns

Edison Bridge

Replacement

1993

Florida, US

Mechanical bar coupler

Lake Belton New Bridge

2002

Texas, US

Grouted duct column connection

San Francisco-Oakland Bay Bridge replacement

2013

California, US

Pipe-pin connection

Squaw Creek Bridge

2008

Iowa, US

Pocket connection in the column to pier cap connections

Escambia Bay Bridge

2007

Florida, US

Pocket connection in the column to pier cap connections

Boone County Bridge

2006

Iowa, US

Pocket connection with corrugated steel pipes

Madison County Bridge

2007

Iowa, US

Pocket connection with corrugated steel pipes

Otomigawa Bridge

-

Ayabe, Japan

High-performance concrete panels for columns