Fig. 9From: Review of accelerated construction of bridge piers - methods and performanceConnection filled with UHPC: a mixture of UHPC; b sag test; c sinking the cushion into the pocket; d positioning of the column in the pocket of the sole; e casting of the void between the column and the footing; f completed specimens (Zhang et al. 2021a)Back to article page