Skip to main content
Fig. 19 | Advances in Bridge Engineering

Fig. 19

From: Failure investigation of a propped cantilever truss bridge

Fig. 19

Connection damage in vertical bracing: a at the top connection with middle truss at joint I of the vertical bracing between the middle and right trusses, b at the bottom connection with the right truss at joint I of the vertical bracing between middle and right trusses, c at the top connection with middle truss at joint H of the vertical bracing between the middle and the right trusses

Back to article page