Skip to main content

Table 2 Evaluation Results Considering Component Correlation

From: Comprehensive assessment of cable-stayed bridge based on Pagerank algorithm

Primary indicators

Secondary indicators

Rating of secondary indicators

Evaluation level of secondary indicators

Rating of primary indicators

Overall rating value

Stay cable System

Visual inspection of stay cables

75.5

3

71.14

77.75 (Level 3)

Cable forces

53.7

4

Main girder

Visual inspection of main girder

40.1

4

51.71

Alignment of main girder

78.8

3

Main tower

Visual inspection of main tower

77.8

3

85

Alignment of main tower

89.8

2

Substructure

Pier

94.1

2

95.07

Foundation

99.1

1

Bearing

83.3

2

Riverbed

100

1

Auxiliary facilities

Bridge deck pavement

84.0

2

88.55

Expansion joint

86.8

2

Longitudinal damping device

96.4

1

Railing and guardrail

84.8

2

Drainage system

92.3

2

Lighting, signage

97.8

1

Mechanical and electrical facilities

95.3

1