From: Aerodynamic loads and bridge responses under train passage: case study of an overpass steel box-girder cable-stayed bridge
Stage
Vibration displacement and acceleration
Counter-force of the temporary pier
Comfort level
Construction stage, girder has not fallen on the temporary pier
√
×
Construction stage, girder falls on the temporary pier
Operation stage