Element

Unit costs (Bourne 2013) (2013) in GBP

Cost rate (2019) in GBP

Concrete (m3)

120

129

Reinforcement (t)

1100

1180

Prestressing steel (t)

3000

3219

Vertical formwork (m2)

50

54

Horizontal formwork (m2)

125

134

TMD (unit)

 

3327