From: Attenuation of pedestrian-induced vibrations in girder footbridges using tuned-mass dampers
Element | Unit costs (Bourne 2013) (2013) in GBP | Cost rate (2019) in GBP |
---|---|---|
Concrete (m3) | 120 | 129 |
Reinforcement (t) | 1100 | 1180 |
Prestressing steel (t) | 3000 | 3219 |
Vertical formwork (m2) | 50 | 54 |
Horizontal formwork (m2) | 125 | 134 |
TMD (unit) | 3327 |