Table 4 Bridge damage states and the corresponding inspection priority and likely post-event traffic states and repair cost ratios

From: Scenario-based earthquake damage assessment of highway bridge networks

Damage state

Slight

Moderate

Extensive

Complete

Range of damage ratio (Werner et al. 2006)

1%–5%

5%–50%

50%–80%

80%–100%

Best estimate of damage ratio (Di) (Werner et al. 2006)

3%

25%

75%

100%

Inspection priority (Dukes 2013)

Low

Medium

Medium-high

High

Likely post-event traffic state (Dukes 2013)

Open to normal traffic- no restrictions

Open to limited traffic- speed/weight/lane restrictions

Emergency vehicles only- speed/weight/lane restrictions

Closed until shored/braced- potential for collapse