Fig. 14From: Aerodynamic loads and bridge responses under train passage: case study of an overpass steel box-girder cable-stayed bridgeGirder dynamic response at different train speeds in construction stage: a maximum displacement value; b maximum acceleration value; c maximum counter-force of the temporary pierBack to article page