Table 5 Value of K

From: Estimation of base grout quantity for cast in situ piles based on field test results

Pier

Pile Description

Grout Quantity (Litres)

Depth of Deposition before Concreting (mm)

Quantity based actual Sediment Deposition (Litres)

K

Stage 1

Stage 2

Total

P 16

P 1

3162.5

2172.5

5335.0

422.0

4512.8

1.18

P 2

3116.6

2273.4

5390.0

448.0

4652.8

1.16

P 3

3117.5

2577.5

5695.0

465.0

4744.4

1.20

P 4

3120.5

2170.5

5291.0

461.0

4722.9

1.12

P 5

3117.5

2172.5

5290.0

484.0

4846.7

1.09

P 6

3100.0

2173.5

5273.5

467.0

4755.2

1.11

P20

P 1

3114.6

2272.4

5387.0

500.0

4932.9

1.09

P 2

3167.5

2178.5

5346.0

492.0

4889.8

1.09

P 3

3115.5

2477.5

5593.0

508.0

4976.0

1.12

P 4

3127.5

2175.5

5303.0

488.0

4868.3

1.09

P 5

3135.5

2175.5

5311.0

565.0

5283.0

1.01

 

P 6

3110.0

2183.0

5293.0

497.0

4916.8

1.08